![]() – Crossing the bridge, starting from either end, and then turning around and walking back to the side they started from. Anyone who walks the entire bridge must arrange their own transportation back to the side they started once the bridge reopens to public traffic at noon. Those who choose this option must reach the midpoint before 10 a.m. – Walking the entire length of the bridge starting from either end. Walkers must be on the side of the bridge they wish to return to before 10 a.m. The turnaround points will move toward the ends of the bridge beginning at 10 a.m., but walkers can walk at least a portion of the bridge if they start by 11:30 a.m. – Starting from either end of the bridge and walking toward the center, turning around at the midpoint and returning to the city they started from, where their transportation is located. Walkers essentially have three main options, outlined in the video: “Overall, the event went so smoothly, and we heard so many supportive comments about the new arrangements.” ![]() Ignace and Mackinaw City, which makes us confident in continuing those options in 2021,” said MBA Executive Secretary Kim Nowack. “Before the walk was cancelled last year, we had two successful years of starting the event from both St. ![]() The bridge walk was cancelled in 2020 due to the COVID-19 pandemic.Ī video, posted on the MBA website at explains the bridge walk schedule and the choices people will have whether they start from the north or south end of the bridge. ![]() Ignace and Mackinaw City, which eliminates the need for busing and offers additional options for participants. The annual Mackinac Bridge Walk is back for 2021, and the Mackinac Bridge Authority (MBA) has updated a video explaining the options people have for participating in this beloved event.īased on the success of the 20 events, the MBA will again start the 2021 Annual Bridge Walk from both St. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |